19, 20 en 21 March 2024 | Evenementenhal Gorinchem

55 sludge-water heat exchangers in Europe’s biggest wastewater treatment plant
Task Industriële Milieutechnieken

55 sludge-water heat exchangers in Europe’s biggest wastewater treatment plant

In 2023, 55 new heat exchangers for the Paris waste water treatment station

Delen:

Facebook
Twitter
LinkedIn
WhatsApp

After several years of evaluating accredited suppliers of sludge heat exchangers, SUEZ selects Lackeby HSW Heat exchangers for the upgrading of Seine Aval WWTP at Achères, France!
Being the largest wastewater treatment plant in Europe, Seine Aval WWTP handles 70% of the Parisians wastewater and have been producing biogas for more than 70 years. To optimize the sludge digestion and biogas production, the process will now be modernized from mesophilic to thermophilic digestion. The biogas will be used to produce electricity and hot water for the operation of the Seine Aval plant, and the modernization is predicted to increase the plants energy self-sufficiency with about 70%.
Lackeby´s sludge heat exchangers where chosen based on the unique design which provides the highest possible heat transfer as well as meeting demands for a small footprint and serviceability. The final design is a result of a fruitful teamwork between Lackeby Products, Roto-Sieve France and SUEZ project organization.
In total, Lackeby will deliver 55 heat exchangers to the plant during 2023!

Contactinformatie

Stuur ons een bericht

Scroll to Top