On the basis of a visual inspection of the bearings, teeth and video footage of the tooth flanks, significant signs of wear were already detected on the gear unit under inspection. There was a risk of breakage to the flanks and complete failure of the gear unit. SEW provided a sustainable solution.
SEW reference project
Retrofit in the Kleinsteinbach sewage treatment plant
Delen:
Facebook
Twitter
LinkedIn
WhatsApp
Contactinformatie
Stuur ons een bericht
- 3044 AS,
- Rotterdam,
- Netherlands