
Vanderkamp
Ensuring water supply during drought at Ankersmit pumping station, Deventer
With two temporary submersible pumps, Vanderkamp ensures the water supply to the hinterland of the Ankersmit pumping station, even at critical water levels in the IJssel.
Adverse weather conditions increasingly place higher demands on water management. For the Ankersmit pumping station in Deventer, Vanderkamp implemented a temporary pumping solution that enabled the water supply to be quickly secured during an extended period of drought with a temporary pumping installation that was optimally adapted to tides.
https://www.workdry.com/vanderkamp/projecten/waarborging-watervoorziening-tijdens-droogte-gemaal-ankersmit-deventer
Other news

Temporary takeover of Hardenberg pumping function.
Together with Van Heteren, Vanderkamp ensured water drainage during the renovation of the Baalder pumping station. Within four days, a temporary pumping installation with a capacity of 4,300 m³/hour was realized.

Takeover of effluent pipe function during maintenance at Amsterdam Wastewater Treatment Plant
Temporary installation at Waternet (WWTP) Amsterdam West ensures a processing capacity of up to 8,400 m³/h and guarantees the continuity of an essential wastewater treatment facility.

Effective water treatment in hydrodemolition Amstelveen
For work on the A9 in Amstelveen, Vanderkamp provided a mobile water treatment installation. The result? Effectively treated process water that complies with the specified discharge requirements.