RWB BV
Sustainable water treatment Delfzijl, MBR and Chemistry
Due to an increasing supply of industrial wastewater from the Oosterhorn industrial area in Farmsum, near Delfzijl, North Water Afvalwater (NWA) wants to expand the current central facility for wastewater treatment. An industrial water pumping station and a demineralised water installation (DWI) will also be installed due to the water demand for the production processes.
To achieve this, NWA has started the Sustainable Water Supply Delfzijl (DWD) project.
Within this project, Witteveen en Bos and NWA have drawn up 7 work packages.
RWB has received the order from NWA for work package 5. Chemistry and 6. MBR. After an engineering phase in the construction team, in which the DO was jointly drawn up, the projects have now entered the realization phase.
Chemistry work package concerns chemical storage and dosing for the WWTP and the DWI.
14 storage and dosing installations are deployed in separate 10 ft containers, spread over the WWTP and the DWI. For the WWTP, a caustic soda dosage is placed in a 40ft container with a 25m3 storage tank.
Work package MBR concerns the UF membrane installation and is the final treatment step of the WWTP.
The sludge water separation takes place in the MBR. This is done by means of submerged plate membranes. The thickened sludge from the MBR is returned to the aerobic reactor. The clean UF filtrate is discharged into the Seaport Canal.

Other news

PB Weerselo | Renovation and hardness reduction
The treatment plant in Weerselo is outdated, making renovation necessary to reduce the risk of failure and bacterial contamination of the clean water. RWB provides an installation to reduce the hardness.

Sustainable cooling water through reuse of rainwater
A water purification plant will be built for a data canter as an innovative solution for the reuse of rainwater to sustainably cool the Microsoft data center

Brabant Water | Backwash Water Recovery Units
RWB Water has realized 2 Backwash Water Recovery Units for Brabant Water in Tilburg and Loosbroek. These play an important role in purifying rinse water from sand filters, which is usually contaminated with oxidized iron and manganese.

The Better Green | Manure and digestate treatment in Haselünne (DE)
The Better Green has commissioned RWB Water and its partners to engineer and build a manure and digestate treatment installation. There will be several installations, the first of which will be installed in Haselünne (DE).

ACCN Zero liquid discharge installation
Commissioned by ACCN (Ash Cleaning Company Netherlands), RWB has realized an installation that cleans the waste water that is released when washing bottom ash from waste incineration plants.

AWS Zwanenburg | Renovation and expansion of WWTP
The wastewater from the Heemstede and Haarlem-Schalkwijk WWTPs is transported to Zwanenburg WWTP. Zwanenburg WWTP will be partly renovated and expanded, making it the largest treatment plant in HHR Rijnland.

WWTP Venlo | Sludge dewatering
The Thermal Pressure Hydrolysis at the Venlo WWTP is being taken out of operation, which means that a new sludge dewatering installation must be prepared. This installation will process the sludge from the WWTP Venlo, Venray, Gennep and Meijel.