
Aannemingsbedrijf G. van der Ven BV
Renovation and expansion awzi Nieuwe Wetering
Commissioned by the Rijnland Water Authority, the Van der Ven – RWB combination completed the renovation and expansion of the Nieuwe Wetering wastewater treatment plant (AWZI). The capacity of the treatment plant has been increased by more than 40%, which was necessary to be able to process the increase in waste flows in the future. The expansion includes the construction of an anaerobic tank, new site pipes, a new reception work and a second secondary settling tank, which means that the treatment capacity is now 1150 m³ per hour.
In addition, the existing installation has been renovated both mechanically and electrically, so that the AWZI can continue to function for the next 15 years without major maintenance. The project has now been successfully completed and the treatment plant is ready for the future.
https://www.vanderven.nl/projecten/renovatie-en-uitbreiding-awzi-nieuwe-wetering
Other products
Heemraadsplein sewage pumping station

Gouda floodgate

Climate-robust stream valley Sint-Oedenrode

Weir, fish lift and debris removal point Opwettense Watermill

Innamepompstation Bergsche Maas

Outflow construction Sint Jansbeek Arnhem
Flush water recovery units Loosbroek and Tilburg

Westwaard sewage pumping station

Renovation Moerriool Sonsbeeksingel
