
Project Keulener Randkanal
Buitenkamp pumps an entire canal with hydraulic calculations and real-time monitoring for maximum safet
Project Description
Work is currently underway along the Keulener Randkanal. As part of planned construction activities, Buitenkamp is responsible for pumping out the entire canal. A temporary bypass system has been installed to control and redirect the water flow, allowing the work to be carried out safely and efficiently.
Technical Preparation
Before the work began, a detailed hydraulic calculation was carried out. This determined the required flow rate, pumping head and overall pumping capacity. These calculations formed the basis for designing and configuring the temporary pumping and bypass system.
Careful preparation is essential to ensure reliable water management throughout the pumping operation. The system has been adapted to the specific conditions of the canal and the requirements of the planned works.
Monitoring and Execution
During the pumping phase, the water level is continuously monitored. This allows changes in the water level to be detected immediately and enables the system to be adjusted when necessary. This helps prevent unwanted fluctuations and reduces additional loads on the canal banks and structures.
The work is being carried out in stages. By adjusting the pumping capacity and water flow according to real-time measurement data, the situation remains stable and manageable throughout the operation.
Result
By combining detailed hydraulic planning, a carefully designed temporary bypass system and continuous monitoring, Buitenkamp ensures that the pumping of the Keulener Randkanal is carried out in a controlled and safe manner. The phased approach and real-time adjustments help maintain a stable water level and reduce the impact on existing infrastructure during the works.

Other products & services

Project Wolfswinkel
Backup system at Wolfswinkel Lock with 4 DN1200 pipes and a capacity of 50,000 m³/h.

About Buitenkamp B.V.
Over 125 years of expertise in pumps, piping and solutions. Buitenkamp is ready for every challenge.

Pump rental
Rent water pumps: construction, high-pressure and dewatering pumps in various capacities for every situation.

Pipe rental
Pipe rental for every pumping job: steel and HDPE pipes, hoses, couplings and fittings from DN100 to DN1000.

Project Solingen
Sewer system modernization in Solingen with a pumping system handling 1,080 m³ of wastewater per hour.

Project Vilicher Bach
S13 expansion: the Vilicher Bach was temporarily diverted to allow construction of a concrete culvert.

Project Prien am Chiemsee
In Prien am Chiemsee, a stream was temporarily diverted to enable the replacement of a railway bridge.

Project Dortmund
New business hall at Segro Park Dortmund: a powerful pumping system was installed this week.