Project Vilicher Bach
S13 expansion: the Vilicher Bach was temporarily diverted to allow construction of a concrete culvert.
For the S13 expansion, the Vilicher Bach was temporarily diverted through a steel pipe beneath the railway. This allowed the concrete culvert to be constructed safely without disrupting rail traffic.
A flexible pumping system was used, with an electric pump for dry conditions and a diesel pump for periods of heavy rainfall. With a total capacity of more than 10,000 m³ per hour, the system ensures reliable drainage even during heavy rain.
The diversion was successfully completed, allowing construction of the concrete culvert to continue as planned. The combination of the steel pipe and high-capacity pumping system ensured a reliable water flow throughout the work.
https://www.pompenverhuur.nl/projecten/project-vilicher-bach-in-bonn/
Other products & services

Project Wolfswinkel
Backup system at Wolfswinkel Lock with 4 DN1200 pipes and a capacity of 50,000 m³/h.

About Buitenkamp B.V.
Over 125 years of expertise in pumps, piping and solutions. Buitenkamp is ready for every challenge.

Pump rental
Rent water pumps: construction, high-pressure and dewatering pumps in various capacities for every situation.

Pipe rental
Pipe rental for every pumping job: steel and HDPE pipes, hoses, couplings and fittings from DN100 to DN1000.

Project Solingen
Sewer system modernization in Solingen with a pumping system handling 1,080 m³ of wastewater per hour.

Project Prien am Chiemsee
In Prien am Chiemsee, a stream was temporarily diverted to enable the replacement of a railway bridge.

Project Dortmund
New business hall at Segro Park Dortmund: a powerful pumping system was installed this week.

Project Keulener Randkanal
Buitenkamp pumps an entire canal with hydraulic calculations and real-time monitoring for maximum safet