Project Solingen
Sewer system modernization in Solingen with a pumping system handling 1,080 m³ of wastewater per hour.
Technical Implementation
As part of the modernization of the sewer system in Solingen, a powerful pumping system was installed to reliably transport up to 1,080 m³ of wastewater per hour. This ensures continuous wastewater flow during the construction work.
A key challenge was the limited space in Solingen city centre. Due to the restricted conditions, a standard solution was not possible. Customized solutions were therefore developed to integrate the pumping system efficiently into the existing infrastructure.
Close cooperation with the client allowed the technical requirements to be coordinated precisely and necessary adjustments to be implemented flexibly. The system was fully adapted to the local conditions and specific project requirements.
Project Status
The installation of the pumping system was successfully completed. This allows the further modernization of the sewer system to continue as planned. During construction, the system ensures reliable wastewater drainage.
Challenges and Solutions
The limited space in Solingen city centre was the main challenge. Thanks to flexible planning, close cooperation with the client and customized solutions, the system was successfully installed and connected to the existing infrastructure.
Result
The successful installation of the pumping system provides an important foundation for the continued modernization of Solingen’s sewer system. With a capacity of up to 1,080 m³ of wastewater per hour, the system supports the safe and efficient execution of the construction work. In the long term, the project contributes to improving and modernizing the region’s wastewater infrastructure.
https://www.pompenverhuur.nl/projecten/project-solingen/
Other products & services

About Buitenkamp B.V.
Over 125 years of expertise in pumps, piping and solutions. Buitenkamp is ready for every challenge.

Pump rental
Rent water pumps: construction, high-pressure and dewatering pumps in various capacities for every situation.

Pipe rental
Pipe rental for every pumping job: steel and HDPE pipes, hoses, couplings and fittings from DN100 to DN1000.

Project Vilicher Bach
S13 expansion: the Vilicher Bach was temporarily diverted to allow construction of a concrete culvert.

Project Prien am Chiemsee
In Prien am Chiemsee, a stream was temporarily diverted to enable the replacement of a railway bridge.

Project Dortmund
New business hall at Segro Park Dortmund: a powerful pumping system was installed this week.

Project Keulener Randkanal
Buitenkamp pumps an entire canal with hydraulic calculations and real-time monitoring for maximum safet

Project Wolfswinkel
Backup system at Wolfswinkel Lock with 4 DN1200 pipes and a capacity of 50,000 m³/h.